Remodeled bathroom by Anani Remodeling in the Roseville and Sacramento area
Roseville · Sacramento Area · Locally Based

Bathroom Remodeling
in Roseville & Sacramento

Your bathroom should feel like it belongs in your home — not like something you're just living with until you get around to fixing it. If that day has finally come, we're a licensed, Roseville-based crew that can help you plan it properly.

Bathroom Remodeling in Roseville & the Sacramento Area

A Bathroom That Finally Works
the Way You Want

Most homeowners put off a bathroom remodel longer than they should. It's disruptive, it isn't cheap, and plenty of contractors make the process harder than it needs to be.

That's why our bathroom work is built around clear communication, honest pricing and showing up when we say we will. Our office is on Lava Ridge Court in Roseville, so site visits, tile samples and inspection days are coordinated by people who work locally. Vanities and storage can be built to fit through our custom cabinetry work, and if the kitchen is next, see our kitchen remodeling.

Whether you're updating a dated guest bath or taking on the primary suite, we'll help you work out what makes sense for your space and budget, and we'll be upfront when something isn't worth the cost. Still at the thinking stage? Our bathroom remodel planning guide covers the decisions worth making first. You can also browse finished projects or read how we work.

What we bring to every bathroom

  • Real in-home consultations — not ballparks over the phone
  • Line-by-line quotes so you know what you're paying for
  • Permit applications and inspections coordinated
  • Waterproofing installed as one compatible system
  • One point of contact from start to finish
  • Licensed & insured · CSLB #1157715
150+
Projects delivered
10+
Years combined experience
What We Do

Bathroom Remodeling Services
in Roseville & Sacramento

We don't have a standard package we slot everyone into. Here's what we typically help homeowners with — and how we approach each one.

Most Common

Complete Bathroom Remodel

A full remodel means starting fresh — new layout if needed, new plumbing, new waterproofing, new tile, new fixtures. It's the right move when things are too far gone for partial fixes, or when you've been picturing something different for years.

We plan it carefully so nothing gets missed. For budgeting, see what a bathroom remodel costs here.

Layout redesignPlumbing & electricalWaterproofingCustom tile workVanity & fixturesFlooringLightingFrameless glassPermit coordination
High Impact

Shower Remodel & Tub Conversion

The shower is usually the biggest pain point: dated surrounds, cramped dimensions, grout beyond saving. The most common version we build is a tub-to-shower conversion, where an unused tub comes out and a walk-in shower goes in with a sloped, waterproofed floor. See how a shower is built to stay dry.

Tub-to-shower conversionCustom tileFrameless glassSteam systemBuilt-in nichesBench seating
Targeted Upgrades

Vanity, Storage & Fixtures

Sometimes you don't need to start from scratch. A new vanity, fresh tile, better lighting and fixtures can change how a bathroom feels at a fraction of the cost. If the vanity is the real problem, a built-to-order vanity sized to the exact wall usually beats anything off the shelf, especially in a narrow room.

Vanity replacementLinen storageTile workLighting updatesFixture swapHeated flooring
Planning Ahead

Accessible & Aging-in-Place Bathrooms

If you intend to stay in the house, a remodel is the practical moment to make the bathroom work for the long run. A low-threshold or curbless entry where the floor structure allows, solid blocking so grab bars can go in later without cutting tile, comfort-height fixtures and better lighting are simpler while the walls are open than as a retrofit. None of it has to look clinical.

Curbless or low-threshold entryGrab bar blockingComfort-height fixturesWider door openingBench seatingLayered lighting
Bathroom Remodel Cost

What a Bathroom Remodel Costs in
Roseville & Sacramento

Bathrooms are small rooms with expensive parts: tile, glass, plumbing fixtures and a lot of skilled labor in a few square feet. These planning ranges are a starting point for budgeting, not a quote. Your number comes in writing, line by line, after we've seen the space.

Targeted upgrade
$8,000 – $20,000

Same layout, nothing moves. New vanity, tile, lighting, fixtures and flooring, usually without relocating plumbing.

Typically 1–2 weeks on site
Complete remodel
$25,000 – $50,000+

Down to the studs. New waterproofing and shower floor, custom tile, vanity and fixtures, updated plumbing and electrical, sometimes a changed layout. Larger primary suites can sit at the top of this range or above.

Typically 2–4 weeks on site

Planning estimates only. Actual pricing depends on scope, materials, site conditions and permit requirements.

What moves the number

Two bathrooms of the same size can land far apart. Thinking about resale? Read what a bathroom remodel adds to your home's value and what's worth remodeling before you sell.

Prefer to spread the cost out? See our financing options (subject to lender approval), or request a free in-home estimate. We're also happy to phase a project.

  1. 1
    Tile area and patternTile is priced more by labor than material. A floor-to-ceiling shower has several times the area of a standard surround, and large-format, herringbone, mosaic and mitered corners all add hours.
  2. 2
    Whether the plumbing movesKeeping the toilet, sink and shower drains in place saves real money. Moving a drain means opening the floor, new rough-in and inspection, and on a slab foundation, cutting concrete.
  3. 3
    The shower buildA pre-formed pan with a standard surround is the economical route. A custom-sloped pan with a linear drain, bench, niches and frameless glass is a different project.
  4. 4
    What's behind the wallsBathrooms hide water damage well: soft subfloor at a toilet flange, a leaking pan, galvanized supply lines in an older house. We budget a contingency rather than assume it won't happen.
How a Bathroom Remodel Unfolds

The Timeline,
Honestly

A bathroom is quicker than a kitchen, but it still has a sequence that can't be rushed. Typical ranges for a full remodel, not guarantees.

  1. 1–3
    weeks

    Design & selections

    Measurements, layout options, tile, vanity, fixture and glass selections, and a written quote. Special-order items are ordered early.

  2. 2–4
    weeks

    Permit review

    When plumbing, electrical or structure changes. Timing depends on the jurisdiction and usually overlaps material ordering.

  3. 2–4
    weeks on site

    Construction

    Demo, rough plumbing and electrical, inspection, backer and waterproofing, tile, vanity, fixtures, paint and punch list. Cure times aren't rushed.

  4. 1–2
    weeks after tile

    Frameless glass

    Glass is measured against the finished tile, then cut and tempered, so it often arrives after the rest of the room is done.

1–2 weeks
Targeted upgrades

A vanity swap or a shower update without layout changes usually runs one to two weeks on site. If the room being remodeled is your only bathroom, say so on the first visit: we sequence the work to keep the out-of-service stretch as short as the scope allows and tell you in advance which days you'll be without it. Inspection scheduling, deliveries and conditions behind older walls can all shift the dates.

The Part You Never See

How a Shower Is Built
to Stay Dry

Every bathroom looks good the day it's finished. The difference between a shower that stays sound and one that quietly damages the framing is in the part you can't see.

Start with what most homeowners don't know: tile and grout are not waterproof on their own. What keeps a shower dry is the waterproofing layer behind the tile and the slope of the floor beneath it. We use one compatible system, installed according to the manufacturer's instructions, rather than mixing products that weren't designed to work together, and we water-test the pan before tile when the system and inspection call for it.

The same thinking applies to details that fail early: an exhaust fan vented to the outside rather than into the attic, and flexible sealant at changes of plane where rigid grout tends to crack.

Ask any contractor what goes behind the tile and how the pan is sloped. A clear answer tells you more than a photo gallery will — it's the question we'd want you to ask us.

  1. Tile and groutThe finish you see. Grout absorbs water, so this is not the waterproof layer.
  2. Setting materialThinset matched to the membrane and tile, per the manufacturer's requirements.
  3. Bonded waterproof membraneThe layer that actually keeps water out of the walls and floor.
  4. Backer board or foam systemCement board or a foam board system, part of one compatible assembly.
  5. Sloped shower floorPitched to the drain so water leaves instead of sitting.

Simplified illustration. Exact layers depend on the system selected and the manufacturer's requirements.

Permits & Code

Permits, Inspections
and Why They Matter

We prepare permit applications, coordinate submission and schedule inspections on every project that needs them.

In California, bathroom work that relocates plumbing, adds or changes electrical, or alters structure generally needs a permit, which covers most full remodels and many tub-to-shower conversions. Whether a smaller scope, like a vanity swapped into existing connections, needs one depends on the building department's requirements for that specific work, so we confirm with the office that has jurisdiction over your address.

Bathrooms also carry code details that catch people out: GFCI protection near water, exhaust fans that vent to the exterior, lighting that meets California's energy code (Title 24), and state limits on showerhead and faucet flow rates. A fixture ordered from an out-of-state site may not meet them, so check before you fall in love with one.

Unpermitted work can surface during a sale, an appraisal or an insurance claim. A permitted remodel is documented work on a documented house.

Who reviews your permit

SacramentoCity of Sacramento
RosevilleCity of Roseville
RocklinCity of Rocklin
FolsomCity of Folsom
Granite BayPlacer County
Fair OaksSacramento County
El Dorado HillsEl Dorado County
Licensed with the California Contractors State License Board — CSLB #1157715. You can verify any contractor's license at cslb.ca.gov; see our licensing page.
Finished bathroom renovation by Anani Remodeling

See more finished bathrooms in our project gallery.

Our Approach

Bathroom Renovation Done
Without the Usual Headaches

The biggest complaints homeowners have about bathroom contractors aren't about tile or fixtures. They're about poor communication, timelines that stretch on, and costs that keep climbing after work starts.

Every project starts with a real walkthrough. We measure, ask the questions most people skip, and look at what's behind the walls if we need to. If something unexpected comes up, we tell you right away and talk through options before acting.

1
In-home consultation
We come see the space, measure everything, and ask the questions that matter before we talk about what it could look like.
2
Detailed written quote
Line-by-line pricing with allowances spelled out before work starts.
3
Build & finish
Work follows an agreed schedule, with one contact for questions throughout.
Planning Your Bathroom

The Decisions That
Shape the Result

A bathroom turns out well or badly mostly because of a few choices, and several of them happen where nobody can see them once the room is finished.

Shower, Tub or Both

Tub-to-shower conversions are among the most common requests we get, and a walk-in shower can make a small bathroom feel much bigger. If it's the only tub in the house, think about how you and future buyers will use it first. Our guide on bathroom remodel value covers the resale side.

Waterproofing and Tile

Tile gets the attention, but the membrane and the slope behind it keep the room dry. Grout lines, tile size and finish affect cleaning and installation cost, and larger tiles mean fewer grout lines. Bring samples home and look at them in your own light before deciding.

Ventilation, Lighting and Electrical

A properly sized exhaust fan vented outside protects new finishes from moisture and is one of the cheapest upgrades while walls are open. Layered lighting — ceiling, vanity and shower — changes the room more than most finishes, and Title 24 lighting requirements are planned from the start.

Vanity, Storage and Comfort

Most bathrooms lack storage, and a made-to-fit vanity with the right drawers solves it better than a stock unit — that's where our custom cabinetry comes in. Heated floors, a bench, niches and a curbless entry are easier to add during a full remodel than afterwards.

Where We Remodel Bathrooms

Based in Roseville,
Working Across the Region

Cracked tile, a shower that never gets warm enough, a vanity from a different decade. The right plan depends a lot on the house, and houses differ from one part of the region to the next.

Roseville & Rocklin

Our office is in Roseville. Many homes here and in Rocklin were built from the 1990s through the 2010s, with builder vanities, prefab surrounds and sometimes a large corner tub beside a cramped shower. Turning that tub footprint into a proper walk-in shower is a frequent request. See Roseville and Rocklin.

Granite Bay & El Dorado Hills

Larger bathrooms where projects lean toward primary-suite rebuilds — large-format tile, custom vanities, frameless enclosures, heated floors and lighting that needs planning rather than a fixture swap. See Granite Bay and El Dorado Hills.

Sacramento

Craftsman homes and bungalows in Land Park, Curtis Park, Midtown and East Sacramento, often with a single small bathroom and original plumbing. Older drain and supply lines can need replacing once walls are open, which is why we look closely before quoting. More on our Sacramento page.

Folsom & Fair Oaks

From newer builds in Folsom to established homes in Fair Oaks, where cast-iron waste lines, galvanized supply or bathrooms added decades after the house was built are worth planning for rather than discovering mid-project.

We also take bathroom projects in Elk Grove, Citrus Heights and Rancho Cordova. See every area on our locations page.

Why Choose Us

Bathroom Remodeling Contractors
Who Actually Deliver

Searching for bathroom remodeling near me turns up a long list. Here's how we work.

We're genuinely local

Not a national franchise. We're a Roseville-based crew serving the Sacramento area, and we know the local building departments and what to expect from homes built in different eras.

No vague quotes

Every estimate is itemized and written down before work starts. If something changes, we tell you before we act — not after.

We show up and finish

Crews that disappear mid-project are a common complaint. We set a schedule, we show up, and we don't consider a job done until you do.

References on request

Ask us for references from recent bathroom projects, and call them. We'll provide them without hesitation.

Beyond the Bathroom

Planning More Than
One Room?

Combining projects can reduce repeat setup and keeps finishes consistent from room to room. None of it is required — we'll tell you plainly when something isn't worth doing now.

Want to read first? Start with our bathroom remodel planning guide, see the project gallery, or browse all remodeling guides.

FAQ

Questions We Hear
All the Time

Honest answers — not marketing copy.

How do I choose a bathroom remodeling contractor?

Check the contractor's license on the CSLB website and confirm it is active, ask for references from recent local bathroom projects and call them, and get a written, line-by-line quote before any work starts. It is also worth asking how they waterproof a shower; a clear answer tells you a lot. Anani Remodeling is licensed under CSLB #1157715, and we're happy to provide references. See our licensing page.

What should I consider when remodeling a bathroom?

Start with what actually bothers you about the current space: layout, storage, the shower, lighting, or all of it. Then think about how long you plan to stay in the home, since that affects whether a full remodel or targeted upgrades make more sense. Plumbing and electrical conditions behind the walls matter too, especially in older homes, and we look at that during the in-home consultation before quoting. Our bathroom remodel planning guide walks through the decisions in order.

How long does a bathroom remodel take?

As a planning estimate, a full bathroom remodel typically takes 2 to 4 weeks of on-site construction, longer if the layout changes. Permit review, when required, can add roughly 2 to 4 weeks before construction starts, depending on the jurisdiction. Targeted upgrades without layout changes usually run 1 to 2 weeks. Frameless glass is measured after tile is finished and then fabricated, so it often arrives 1 to 2 weeks after tile. Inspections, deliveries and conditions behind the walls can all shift the schedule.

How much does a bathroom remodel cost in Roseville and Sacramento?

As a planning estimate, a targeted upgrade (new vanity, tile, lighting and fixtures in the existing layout) often runs about $8,000 to $20,000. A complete remodel with a rebuilt shower, custom tile and new fixtures generally runs about $25,000 to $50,000 or more, depending on size, materials and whether the layout changes. These are ranges, not quotes. You get a written, itemized quote after an in-home consultation. For the resale side, read what a bathroom remodel adds to your home's value.

Do you handle permits for bathroom remodels?

Yes. Bathroom work that relocates plumbing, adds or changes electrical, or alters structure generally requires a permit, and we prepare the application, coordinate submission and schedule inspections on qualifying projects. Whether a smaller scope needs one depends on the building department's requirements for that work, so we confirm with the office that has jurisdiction. The cities of Sacramento, Roseville, Rocklin and Folsom run their own building departments; Granite Bay goes through Placer County, Fair Oaks through Sacramento County, and El Dorado Hills through El Dorado County.

Can I stay in my home during a bathroom remodel?

Usually yes, as long as you have another bathroom to use. If the room we're remodeling is your only bathroom, tell us at the estimate so we can plan the sequence around it and tell you in advance which days it will be out of service. We clean up every day before we leave, and we let you know ahead of time when water will be shut off.

Can you convert my bathtub into a walk-in shower?

Yes, it is one of the most common projects we do. Whether it is a simple swap or a larger job depends on the existing plumbing, the floor structure and the size of the space, and we check that at the in-home visit. The new shower floor is sloped to the drain and waterproofed as a complete system. A conversion that moves the drain or plumbing generally needs a permit, which we handle.

Should I keep a bathtub for resale?

It depends on your home and who is likely to buy it. Many buyers, especially families with young children, look for at least one tub in the house, so if you are removing your only tub it is worth thinking through first. Our guides on bathroom remodel value and what to remodel before selling can help you decide.

How do you waterproof a shower?

Tile and grout are not waterproof on their own; grout absorbs water. What keeps a shower dry is the waterproofing layer behind the tile and the slope of the floor beneath it. We use a compatible system, typically cement backer board or a foam board system with a bonded membrane, installed according to the manufacturer's instructions, slope the pan to the drain, and water-test the pan before tile when the system and inspection call for it. Products are only as good as the installation, so we follow the manufacturer's requirements rather than mixing parts that weren't designed to work together.

Can you make a bathroom easier to use as we get older?

Yes, and a remodel you're already doing is the practical time for it. A low-threshold or curbless shower entry where the floor structure allows, solid blocking in the walls so grab bars can be added later without opening tile, comfort-height fixtures, a bench, better lighting and a wider door opening are all simpler to include while the walls are open than to retrofit afterwards. None of it has to look clinical.

Can you build a custom vanity?

Yes. If the space is an unusual size or you want specific drawers and storage, we can build a made-to-fit vanity through our custom cabinetry work. For a standard layout, a stock or semi-custom vanity may be the better value, and we'll tell you which makes sense.

Do you offer financing?

Financing options may be available through third-party lenders, subject to credit approval and lender terms. Current options are on our financing page. Phasing a project into stages is another way to manage cost, and we're glad to talk through that.

What areas do you serve?

Our office is in Roseville. We remodel bathrooms in Roseville, Sacramento, Rocklin, Folsom, Granite Bay, Fair Oaks and El Dorado Hills, and we also take projects in Elk Grove, Citrus Heights and Rancho Cordova.

Get Started

Ready to Start Your
Bathroom Remodel?

Tell us about your project and we'll set up a time to come take a look. No obligation, no pressure — just an honest conversation about what's possible and what it's likely to cost.